The efforts to elevate the Pekalongan railway construction affected by flooding

  • 21st January 2026 15:27 GMT+7
The efforts to elevate the Pekalongan railway construction affected by flooding
The track maintenance train checked the condition of the tracks affected by flooding near Pekalongan Station, Pekalongan City, Central Java, on Wednesday (21/1/2026). The President Director of PT KAI (Persero), Bobby Rasyidin, stated that the company will strengthen and elevate the railway track construction affected by the flood up to a maximum of 50 centimeters along approximately 600 meters, including adjustments to the bridge and platform structures previously identified as having depressions. ANTARA FOTO/Harviyan Perdana Putra/wsj.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3114x2076
File size
1.62 MB
Created
21/01/2026 15:27 WIB
Photographer