GAS FLOW TO DUMAI INDUSTRIAL AREA
A worker crosses inside the factory complex PT Kuala Lumpur Kepong (KLK) in the Industrial Area PT Pelindo I Dumai in Dumai, Riau, Monday (6/4/2020). PT Pelindo I Dumai to meet the needs of PT KLK with capacity reaching 145 thousand m3 per month. ANTARA PHOTO/Aswaddy Hamid/wsj.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.